Erection of DWTB OSS

Lifting and Erection of Columns

Erection 1

 

Lifting and Erection of Horizontal Member and Sign Boards

Erection 2

 

Horizontal Member Connection to Columns

Erection 3

 

Erection 4

 

Completed Decommissioned Wind Turbine Blade Overhead Sign Structure

Erection 5

The completed DWTB OSS, installed at the Civil and Environmental Engineering Department Structural Laboratory at the University of Houston, achieved a vertical clearance of 18.5 feet and a clear span of 40 feet, reflecting the requirements for a standard two-lane highway.